Mill Street Sidewalk Construction

As part of the City of Richmond Hill’s ongoing commitment to maintaining a high quality pedestrian connection network, the City will be undertaking the installation of a 1.5 metre wide concrete sidewalk adjacent to the existing curb. The scope of work will include construction of a concrete sidewalk to City standards, minor grading, tree timing, shrub removal and driveway replacement within City Right of Way.
 
The construction is planned for summer 2022. Before the construction starts the City request the resident to relocate any personal plantings or vegetation and sprinkler systems that may be within the grading limits. Thank you for your cooperation.