Cedar Springs Stormwater Management Facility Rehabilitation SWMF 16-8

Richmond Hill is currently conducting a Feasibility Study with respect to the Cedar Springs stormwater management facility located at 24 Cedar Springs Drive. The study area is shown in the map above.
 
The study will evaluate options to rehabilitate the existing stormwater management facility and correct existing deficiencies.
 
As part of the feasibility study, multiple field investigations will be undertaken by the City’s consultants on City-owned property to determine the current condition of the pond.
 
These investigations will include:
• Topographic and Bathymetric Survey
• Natural Heritage Surveys
• Archaeological Investigation
 
It is anticipated that these investigations will begin October 2020 and are expected to be completed by the end of the year or early 2021.